contact us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right.

31 Chandlers Rd.
Toowoomba (Flagstone Creek)
Australia

0427888890

Type B Gas Fitter. Compliance Certificates, Industrial Appliance Certification, Type B Gas Certification, Air analysis, gas efficiency,. Installation, Certification, Servicing, Maintenance and Repairs of spray booths, grain dryer certification, fruit dryers certification, package burners,  techrite burners,  zephyr burners, ladle burners, batch ovens, LPG Storage etc.

Type A gas fitter... Installation, maintenance and repairs of hot water systems, cooktops, ovens, heaters, fire places, etc.

Plumbing... Industrial, Commercial and Domestic. Installations, maintenance and repairs

Servicing Queensland and Northern NSW Roma, Kingaroy, Mitchell, Goondiwindi, St George, Cecil Plains, Charleville, Milmerran, Allora, Warwick, Stanthorpe, Pittsworth, lockyer Valley,   and northern NSW. Providing the following services... Gasfitter and plumber servicing: Toowoomba, Darling Downs, Western Downs, Southern Downs, South Burnett and Lockyer Valley.

Owned and run locally by Michael Poole Industrial Gasfitter. Emergency call outs.

 

BULK STORAGE & TANKS

AVAILABLE 24HRS/ 7DAYS

MICHAEL POOLE

CALL 0427 888 890

 

Bottles to Bulk Tanks. We are available to cart, install and refurbish customer owned vessels or vessels from the major suppliers. Industrial and commercial.

Installation of industrial and commercial bulk storage tanks and cylinders

  • Vapour withdrawal manifold installation complete with pressure regulation and over pressure protection.
  • Liquid withdrawal supply lines.
  • Vapour manifold installation
  • Regulator and over pressure installation.
  • Manifolding of multiple tanks specifically designed to meet vapour withdrawal requirements of the appliance.
  • Complex site audits and compilation of reports.
  • Valve and SRV refurbishment on bulk storage vessels.
  • Low, medium and high pressure supply lines.
  • Scheduled maintenance programs and reports.